Water Treatment Works: Chemical Offloading Interlock System

  venium Engineering successfully designed, supplied and installed chemical tanker offloading interlocking systems to prevent accidental discharge of chemicals to the rain water drain during chemical offloading operations at waste water treatment plant. 

This application ensures that the chemical bund diverter valve is diverted to the offloading bund spill tank prior to offloading being able to take place. If the operator accidentally left the diverter valve in the position where it is routing to the rain water drain then hazardous chemicals could be released to the rain water course. This could be catastrophic for the environment, and costly to the operator. 

For this scope Avenium Engineering provided the following services:

> System design.

> Supply of Sofis manufactured Netherlocks valve interlocks.

> Installation and commissioning of the interlocking systems.

Where to find us

Our team of experts are always on hand to help you with your application requirements

  • 3A Bowes Road Business Park
    Middlesbrough
    TS2 1LU
    United Kingdom
  • HQ No: (+44) 01642 989110
    Aberdeen No: (+44) 01224 766931
  • info@avenium.co.uk

How can we help you?

Are you looking for a quote, need information about a specific product, or require technical support?

© 2022 Avenium Engineering Limited

Web Design by Make it Seen Media